Write the project narrative in the editor — two or three paragraphs on the problem, the constraint and how the set resolved it. Drop image blocks below for drawings and photographs.
02 · Residential · 2023
112 Tapadero Avenue
Secondary dwelling unit · OBC 9.10.19 egress
Location
Ottawa, Ontario
Area
—
Role
Working drawings
Issued
2023
Similar project on your desk?
Send a brief